More Videos

Here's your first look at the Mormon temple in Meridian 2:29

Here's your first look at the Mormon temple in Meridian

Week 8 Treasure Valley high school football plays 4:17

Week 8 Treasure Valley high school football plays

Here are Boise State's best plays from Saturday's game against SDSU 6:35

Here are Boise State's best plays from Saturday's game against SDSU

Have you seen this trailer for Marvel's 'Black Panther'? 2:20

Have you seen this trailer for Marvel's 'Black Panther'?

Take a look at Richland's newest french fry factory 0:44

Take a look at Richland's newest french fry factory

Cougar's reflection caught on camera as it peers into windows of Washington school 4:12

Cougar's reflection caught on camera as it peers into windows of Washington school

Harvey Weinstein faces more sexual assault allegations 2:52

Harvey Weinstein faces more sexual assault allegations

Ada County Sheriff's Office receives $1 million to help reduce its jail population 2:32

Ada County Sheriff's Office receives $1 million to help reduce its jail population

Valley County's new coroner says Idaho laws on handling bodies are vague 1:12

Valley County's new coroner says Idaho laws on handling bodies are vague

The best things Boise State football players had to say after beating San Diego State 3:33

The best things Boise State football players had to say after beating San Diego State

  • Rafters and kayakers: Here's a sneak peek at the next big Boise River wave

    Engineers are testing a quarter-scale model of the next big wave planned for the Boise Whitewater Park. The adjustable wave will be installed downstream from the new Esther Simplot Park. Scott Shipley, President S20 Design and Ralph Budwig, Director, Center for Ecohydraulics Stream Laboratory talk about the design of the second phase.

Rafters and kayakers: Here's a sneak peek at the next big Boise River wave

Engineers are testing a quarter-scale model of the next big wave planned for the Boise Whitewater Park. The adjustable wave will be installed downstream from the new Esther Simplot Park. Scott Shipley, President S20 Design and Ralph Budwig, Director, Center for Ecohydraulics Stream Laboratory talk about the design of the second phase.
Kyle Green kgreen@idahostatesman.com